Work Required: Concrete repairs to swimming pool sub structure.
Work Carried Out: Concrete Renovations carried out a hammer sounding test to determine the limits and proportions of the concrete defects. Unsafe spalled concrete was removed to prevent large pieces of concrete falling from height. Defective concrete was broken out back to sound substrate, and any corroded steel was cleaned and an application of Sika Monotop 610primer was applied. Galvashield sacrificial anodes were attached to the cleaned reinforcement and repaired areas were filled with Monotop 615.
Follow Us
Stay updated & join the
Concrete Renovations Community